+8801971790694House #45, Malibagh Chowdhury Para, Dhaka-1217deshitimber@gmail.com
Local timber through a clear production line
Deshi Timber sawmill in Dhaka
●Deshi Mill Journal / Malibagh / Dhaka

Timber Enters Raw. Leaves Ready.

Deshi Timber & Sawmill organizes the change from log and rough stock to practical, measured timber through a clear production sequence.

Read the Production Line
Current chapter / 01Material → Method → Useful SectionTell us the timber, finished size, quantity and intended use.
01
ReceiveRead the material
02
SawOpen useful sections
03
SizeWork to dimensions
04
PrepareFinish the surface
05
ReleaseBundle and move
Bangladeshi sawmill supervisor inspecting timber
Inspect the material before deciding the cut.
Material Intake

Every Log Enters with a Different Story.

Species, grain, defects, moisture and diameter affect what useful sections can be produced from the same raw material.

01

Identify the Requirement

Start with the final use, section, length and quantity.

02

Review the Stock

Check visible condition and the practical cutting direction.

03

Set the Production Route

Choose the order of sawing, sizing and surface preparation.

Connected Mill Cells

Six Stations Along the Production Line.

Each station changes the material and prepares it for the next controlled step.

Log intake and positioning
CELL / 01

Log Intake

Raw material received, reviewed and positioned for practical processing.

Timber bandsaw service
CELL / 02

Primary Sawing

Logs and rough stock opened into useful timber sections.

Timber sizing service
CELL / 03

Sizing & Cutting

Boards prepared to discussed widths, thicknesses and lengths.

Timber planing service
CELL / 04

Planing & Surface Prep

Rough surfaces prepared for handling and the next craft stage.

Timber stock supply
CELL / 05

Stock Supply

Discuss available timber types, board sizes, quantity and use.

Timber handling and delivery
CELL / 06

Bundle & Delivery

Finished timber organized for collection or agreed local movement.

Output Floor

Prepared Timber Enters the Next Craft.

Sawing is not the final destination. It creates the material starting point for joinery, doors, furniture and building interiors.

Solid timber doors and frames under construction
Output / joinery

Doors, Frames & Fitted Work

Prepared sections support accurate joints and dependable installation.

Timber used in a contemporary building interior
Output / architecture

Wood Within the Space

Beams, slats and panels add warmth, rhythm and material character.

Order Data

Four Inputs for a Clearer Cut.

Prepare the information that defines what the mill should produce.

DATA / 01

Timber Type

Name the species or bring a sample if identification is needed.

DATA / 02

Finished Section

Share required width, thickness and length after preparation.

DATA / 03

Quantity

Prepare a board, stock or cutting list.

DATA / 04

Intended Use

Explain whether the timber is for joinery, furniture or building work.

Production Sequence

Five Checks from Intake to Dispatch.

01 / RECEIVE

Confirm Order

Review timber, size, quantity and use.

02 / INSPECT

Read Material

Check condition and cutting direction.

03 / PROCESS

Saw & Size

Create the agreed timber sections.

04 / CHECK

Review Output

Check dimensions and preparation.

05 / RELEASE

Bundle & Move

Prepare for collection or delivery.

Mill Enquiries

Send the Size. Tell Us the Use.

Share timber type, dimensions, quantity and the date you need it.

AddressHouse #45, Malibagh Chowdhury Para
Dhaka-1217, Bangladesh